Petrolink Midstream

Petrolink Midstream owns over 3,000 miles of natural gas pipeline and a number of facilities throughout Oklahoma.

Powerful Connectors

Our full-service operation includes natural gas gathering, compression, processing, treatment and dehydration.

Our Midstream team is uniquely positioned for growth — the combination of business acumen and the boots-on-the-ground, real world experience backs our strategic decisions, and allows us not only to respond to, but to anticipate industry needs.

over 115 MMSCF/D of Processing Capacity

Over 825 GPM of Treating Capacity

Loading map…

Operational Facilities

Paden Plant

The Paden gathering and processing facility consists of a cryogenic processing plant with amine and refrigeration on the front end and nitrogen rejection on the back end, with a refrigeration plant beside it. Paden gathering has over 20,000 HP field compression.  The system is a low pressure gathering system from Hughes, Seminole, Okfuskee, Pottawatomie, Lincoln, Oklahoma, Payne, Osage, Logan and Creek counties in central Oklahoma.  The Paden processing plant has a total processing capacity of approximately 82 MMcf/d with residue being delivered to Energy Transfer and Oklahoma Gas Transportation. The natural gas liquids are delivered to ONEOK’s liquid pipeline.

Harrah Gathering & Processing Facility

The Harrah gathering and processing facility consists of two cryogenic processing plant. Harrah gathering has over 14,000 HP field compression. The system is a low pressure gathering system from Lincoln and Oklahoma counties in central Oklahoma. The Harrah processing plant has a total processing capacity of approximately 40 MMcf/d with residue being delivered to Energy Transfer. The natural gas liquids are delivered to ONEOK’s liquid pipeline.